Home ButtonAbout Buttoncapabilities ButtonServices Button Projects ButtonMedia Videos Button Safety Button Partners Button Contact Button

Services - Trash Rakes / Stop Log Systems

ENAD is an Authorised dealer for Atlas Polar for sales to customers, to sell directly to accounts related to the government, and to promote to the best of its ability the sale of such products.

Atlas Polar has designed and manufactured ST9000, HB9100, DT9300 and Log Puller parts and accessories related to the brand names of Hydrorake products in Canada since 1974. State-of-the-art Atlas Polar waterway debris cleaning and control systems have kept water flowing in the most extreme conditions – 24/7 – at more than 400 installations across North America. For over 40 years, they’ve been proven to dramatically increase flow efficiency, reduce operations and maintenance costs, and improve safety and morale at water intakes, hydroelectric dams, irrigation canals, and fish ladders.

Trash Rakes

The Atlas Polar trash raking system cleans any gauge screen or bar rack. Installation upstream provides space for trash removal and deck access for personnel. The fully automatic system replaces handraking, which is still the most common method of rack maintenance. The Hydrorake imitates this action automatically 24 hours a day even in the coldest weather.

Stop Log Systems

The Atlas Polar Stop Log Lifter is now established as an effective and efficient way to secure and remove logs, stack logs and retrieve and replace logs in the sluiceway.

Before the hydraulically operated Atlas Polar Stop Log Lifter System was developed the function of stop log control was performed by hand cranked winches which have their lifting hooks manually engaged in the log dees or by thrown grapples.

The work was physically demanding and hazardous, especially in adverse weather conditions, often leading to low crew morale. Further, the manual method required the use of peavies to handle logs on the dam top and when replacing them in the gains.

When compacting logs in the sluiceways the usual method called for a strongback set across the underside of the sluice opening and a heavy duty jack to provide downward thrust to ensure a seal off. This procedure has been known to raise the dam deck at the point of application, not to mention requiring some agility on the part of the crew which could number up to six men when changing logs.

OKLAHOMA OFFICE
2879 N. Hillcrest Dr
Moore, OK 73150
Phone: (888) 355-7604
Direct: 765 942-5019

INDIANA OFFICE
329 West College St.
Ladoga, IN, 47954

 

DUNS:079238901
CAGE:71VE6

 

Atlas Polar Trash Rake

 

Atlas Polar Stop Log Lifter System

HOME | ABOUT | CAPABILITIES | SERVICES | PROJECTS | SAFETY | MEDIA | SAFETY | OUR PARTNERS | CONTACT | HUMAN RESOURCES |
©2020-2026 ~ ENAD , Oklahoma / Indiana All Rights Reserved
Disclaimer - ENAD strives for price, quality and product accuracy. In the event of price changes (or incorrect prices) on a quote /estimate, you will be notified by email or phone, and given the option to accept the corrected price or cancel the order. Prices and availability are subject to change without notice. Furthermore, ENAD quotes and prices may be subject to final technical assessment of your requirements.